When hotel carpets are delivered in batches, how can color variation be controlled through dye-lot records and retained samples?
Color variation in carpets delivered in batches is mainly controlled through 3 things: dyeing as much as possible in the same lot, pre-blending yarn across batches before weaving, and retaining a sample from each batch and checking it under real lighting. Procurement and order-tracking staff should write the dye lot, batch number, retained samples and installation areas into the production scheduling and acceptance agreement, and make clear that the allowable color variation range is based on the contract and physical samples.
When color differences appear in carpets delivered in batches, in most cases it is not that the pattern was drawn incorrectly, but that the yarn comes from different dye lots and different weaving batches, compounded by changes in on-site lighting and viewing distance. To keep color variation under control, procurement and order-tracking staff should make dye-lot records and retained-sample checks into traceable actions at the 4 stages of sampling, production scheduling, factory release and site entry, rather than waiting until installation is complete to pick out problems.[1]
First distinguish 2 kinds of batch: dye lot and weaving batch number
A dye lot refers to the batch in which the yarn is dyed; yarn from the same 1 dye lot has the closest color. A weaving batch number refers to the batch in which this yarn is woven into carpet. For batch deliveries, if a later batch uses yarn from a different dye lot, even with the same formula, a visible difference in shade may still appear. Therefore, when tracking orders, record both the dye lot and the weaving batch number, and make the 2 correspond to specific installation areas.
The factory practice disclosed by ADA FLOOR is: concentrate dyeing in the same 1 dye lot, pre-blend yarn across batches before weaving, and reduce color variation at the source. Each roll of carpet is accompanied by a batch number and installation area cross-reference table, and is packaged for factory release only after passing inspection. This is the production scheduling and factory release management approach described in the brand materials; whether a specific project uses the same dye lot and what the pre-blending ratio is still need to be confirmed with the factory before production scheduling and written into the delivery agreement.
Under what conditions should retained samples be compared
The key to retained-sample checking is not "whether a sample was retained," but that the retained sample and mass production are compared under the same conditions. Sample approval usually progresses from an A4 sample to a 1:1 area sample; color variation should be confirmed under real lighting and viewing distance, and only after the project party, design party and supplier 3 parties seal the sample does it enter the mass production queue. After sealing, each subsequent batch should be compared with the sealed sample before factory release, rather than with screen images or memory under showroom lighting.
The procurement party may require: the sealed sample piece is marked with dye lot, batch number and date; a small piece from the same batch is retained with each shipment; after site entry, the retained sample is compared with the delivered carpet face under the same light source. The materials do not give a unified numerical standard for color variation; the allowable range should be agreed in the contract between the project party and the supplier, and judged on the basis of physical samples.
How should production scheduling and delivery stages be translated into records
Only by breaking control actions down to stages does order tracking have something to work with. Before production scheduling, confirm the quantity for each area and the delivery sequence, and as far as possible have the same visually continuous area (such as 1 corridor or 1 lobby) use the same 1 dye lot. When cross-batch use is unavoidable, require pre-blending before weaving and record the pre-blended batches. At factory release, check each roll's batch number and installation area cross-reference table, and confirm that inspection records are complete. After site entry, first inspect the substrate, then install by area according to the cross-reference table, place seams along low-traffic circulation routes, and at completion conduct a joint inspection by the project party, interior finishing party and supervisor.
It should be noted that dye-lot records and retained-sample checks address batch color consistency, and are not equivalent to proof of performance such as flame retardancy, environmental performance or durability. Material names and process categories cannot by themselves prove these effects for a specific model; during procurement, the corresponding model's test materials, samples, maintenance requirements and contract terms should be checked separately.
Procurement and acceptance recommendations
It is recommended to specify in the contract: the recording method for dye lots and batch numbers, the number of retained samples and the custodian, the light source and viewing distance for sealed-sample comparison, whether the same continuous area requires the same dye lot, the execution and recording of cross-batch pre-blending, and the handling sequence for color variation disputes. Acceptance should be based on the sealed sample and contract terms, with on-site visual rechecking as a supplement. If the project has very high requirements for color consistency, the supplier can be asked at the sampling stage to explain the batch production scheduling plan, and then decide whether to accept batch delivery.