ADA HOSPITALITY & DESIGN
From concept to delivery for hospitality and design teams
Original design, budget-led engineering, an in-house factory and project coordination on one line—so ambitious carpet systems can be delivered with certainty.
Request project credentials
Design intelligence. Factory certainty.
Complex projects need design and manufacturing on the same line
From design development and material engineering to samples, production and installation coordination, our in-house factory controls quality and programme while budget-led design protects the intended visual character.
- 17 five-star hotel case files
- Since 2001 design and manufacturing
- End to end quality control
Budget-led design, without losing the visual idea
Lobby, guestroom, corridor, ballroom and brand spaces each receive the right construction, fibre, density, fire and maintenance strategy.
Selected hotel projects
Eight representative projects drawn from seventeen five-star hotel case files — sky lobbies, heritage restorations, resorts and urban rooms.

广州四季酒店
Four Seasons · Guangzhou · 广州天河 · 广州国际金融中心 69–100F

上海和平饭店
Fairmont Peace Hotel · Shanghai · 上海黄浦 · 外滩20号

广州瑰丽酒店
Rosewood · Guangzhou · 广州天河 · 周大福金融中心 95–108F

香港丽思卡尔顿酒店
The Ritz-Carlton · Hong Kong · 香港九龙 · 环球贸易广场 ICC 102–118F

上海外滩 W 酒店
W Shanghai · The Bund · 上海虹口 · 北外滩 · 黄浦江与苏州河之间

上海外滩华尔道夫酒店
Waldorf Astoria · Shanghai on the Bund · 上海黄浦 · 中山东一路2号(外滩2号)

黄山悦榕庄
Banyan Tree · Huangshan · 安徽黄山 · 黟县宏村镇

上海四季酒店
Four Seasons · Shanghai · 上海静安 · 威海路
End-to-end delivery
- 01Design development and budget alignment
We take the interior concept drawings, area schedules and handover milestones and translate renders into weavable artwork: 1:1 pattern drawings, yarn colour cards and process sheets. The budget is calibrated zone by zone and construction by construction, with rebalancing proposals stating which areas protect the key visual effect and which absorb it through structural substitution.
- 02Material engineering and sample approval
Construction follows each zone's duty: 4-metre Axminster broadloom for guestrooms and corridors, hand-tufting for irregular areas. Fibre blend, pile height, density, fire, antistatic and emission targets are all fixed on the sample sheet. From A4 sample to 1:1 area mock-up, colour is judged under real light and real viewing distance; nothing enters bulk production before the three-party seal.
- 03In-house production management
Our Xiqiao, Foshan factory schedules by handover sequence. Dyeing stays within one lot number and cross-lot yarn is pre-blended before the loom to remove shade shift at source. In-line checks watch pile height, density and pattern registration; every roll ships tested, packed and matched to its room on the layout plan.
- 04Delivery and installation coordination
Before laying, the slab is surveyed: flatness, moisture and cleanliness of the screed documented line by line. The cutting plan parks seams in low-traffic lines and pattern matching is judged invisible to the naked eye. Handover is a joint walk with fit-out contractor and client, maintenance manual included: vacuum routes, quarterly deep cleans and stain protocols.
Built for professional collaboration
- Design development
- Material engineering
- Sample management
- Factory production
- Installation coordination
ADA FLOOR